GARY L. BURGESS, P.E.

8928 Castlebay Dr. 

(704) 543-1879

Charlotte, NC 28277 

MProengineer@aol.com

OBJECTIVE

Process/Project Engineer – Manager for Biotech/Pharmaceutical or Related Process Industry

SUMMARY

Project Engineer/Manager in handling complete project cycle, including feasibility, sales, marketing, detailed design, planning, scheduling, budgeting, capital approval, specification, vendor selection, bid evaluation, construction management, plant startup, acceptance & final/engineering turnover.
Process/Facilities Engineer with experience in all aspects of process & utility engineering/ design, including conceptual design, R&D, pilot plant study, generation of PFD/PID’s, technical support, trouble shooting, startup, commissioning & operations.

EXPERIENCE

1 PROENGINEER, Charlotte, NC 1993 - Present

Project Engineer/Manager

Wrote Functional Requirements Specifications – FRS, Remediation & Validation Plans – R&VP, Validation Trace Matrixes, Automation Installation Qualifications - AIQ & Automation Operational Qualifications - AOQ for Biological Products Infrastructure & Water for Injection Building Management Systems – BMS. Participated in the Operation Qualification of HVAC & Airlock/Door Systems.
Developed preliminary P&ID’s for contract manufacture of an active pharmaceutical ingredient - API using Thin Film Evaporation/distillation along with a 12 circuit Clean-in-Place - CIP system. Completed outlines & estimates for DQ, IQ & OQ along with preliminary scope/system integrator interviews for a 21 CFR Part 11 compliant Intellution - iFIXTM, iHistorianTM, & iBatchTM batch process control system.
Designed process & plant design for converting animal blood from a $600 to $3800/ton product. Conducted pilot studies on centrifugation, conditioning, filtration, evaporation, membrane concentration & spray drying for separating plasma & cellular fractions.
Multiple infrastructure & process improvement/addition projects for adhesive, coating, agricultural intermediates & other specialty chemical projects.
Lead Process Engineer for the design/upgrade of USP water, DI Urea, chemical & waste inactivation systems for insulin, parathyroid & human growth hormone manufacturer.
Managed the design, purchase & construction contracts of a tissue cell production renovation/upgrade project.
Team leader for the development & implementation of ISO 14000 program for an animal vaccine manufacturer.
Developed process design for an emulsification upgrade project to increase vaccine efficacy, enhance production flexibility & reduce cycle time 40%.
BioPort, Lansing, MI - 1999 direct employee
Project Manager for $1.5 million chiller, centrifuge, CIP & neutralization system project for producing Human Plasma Derivatives Fraction II - Immune Globulin & Fraction V - Albumin.
Project Manager for $0.1 million albumin pasteurizer controls enhancement project. Assisted in change control, commissioning, & validation - IQ, OQ & PQ.
Improved process safety for anthrax vaccine fermentation & separation process.
Wyeth, Marietta, PA - 2001/2002 direct employee
Managed $0.75 million Clinical Live Virus Aseptic Filling/Lyophilization Project from Scope of Work - SOW & Basis of Design - BOD through Engineering Turnover Package - ETOP & Commissioning. First project to incorporate Project Management & Commissioning Standard Operating Procedures – SOP’s & HVAC Engineering Standards.
Developed designs for $10 million Vaccine Development Center renovation. Created database for utility requirements, relocation, storage, calibration & reinstallation of 450 pieces of laboratory equipment.
Led Scope of Work & Design for $0.5 million Biosafety Level – 2 (BL-2), non Live Virus Clinical Filling/Freeze Drying – Packaging enhancement project. Project included new 300 square feet Laminar Flow Unit - LFU with near continuous low wall returns.
Developed SOW & designs for $0.4 million cGMP – small pox vaccine warehouse lighting/security project & $0.25 million clinical packaging relocation.
Plant representative during construction of 25,000 sq ft Cold Adaptive Influenza Vaccine facility & 5,000 sq ft expansion design for doubling the dosages of the initial facility.

MARATHON, Augusta, GA 1991 - 1992

Process/Project Engineer - Manager

Managed design, construction, & startup of a $3 million polymerization process addition increasing capacity 350%.
Completed all remaining project management & engineering commitments as the last working employee during the closure of Marathon's Southern Engineering Office.

RHODIA/Rhone Poulenc, Spartanburg, SC 1989 – 1991

Plant Engineer - Manager

Managed all project/engineering, environmental, maintenance, & utility functions. Managed the design, construction, HAZOP & startup of a $1 million ethylene oxide derivatives batch reactor project improving cycle times 35%. Assisted in the design, permitting & construction of a $2.5 million wastewater treatment plant & a $9 million phosphate ester batch reactor process, warehouse, tank farm, cGMP drumming & DCS project.

LOCKWOOD GREENE/J. A. Jones, Spartanburg, SC 1983 – 1989

Process/Mechanical Project Engineer – Manager

Leading High Tech/Pharmaceutical income producing project manager for over a year. Projects focused on the design, troubleshooting, & startup of process/utility systems.

ONSANTO/MEMC, Spartanburg, SC 1980 - 1982

Facilities Engineer

Managed utility systems & maintenance/operation technicians. Coordinated acceptance, startup, tie-in & operation of utilities with each new manufacturing department during phased 14-month construction & startup of brown field microelectronics silicon wafer plant.

DOW CHEMICAL/Union Carbide, Technical Center, S. Charleston, WV 1975 - 1980

Process/Project Engineer

Business team member for the design, development, marketing, & sales of pure oxygen biological reactor & disinfection/chemical enhancement ozonation systems.

EDUCATION

WEST VIRGINIA COLLEGE OF GRADUATE STUDIES - Chemical Engineering

MICHIGAN STATE UNIVERSITY

MS Sanitary Engineering – 1975 BS Mechanical Engineering – 1973

 